Turn on point names and codes, import pdf using measured control points, perform existing ground topo.
Commercial Site #2
Review data and surface, create stockpile volumes for existing piles. Change project work order to create design in. COGO point bearing distance to create building corners at finish floor elevation. Bring 3d view over and use measured surface.
Commercial Site #3
In COGO create a breakline for contour, review surface changes.
Commercial Site #4
Review contours and manholes, Draw in edge of pavement as a feature line.
Commercial Site
Save surface as design, Change project to new design and workorder to existing conditions with topo shots. Go into COGO review and edit data and compute volume. Comparison of measured surface to office design.